AP82 insights

What General Contractors Should Include in a Millwork RFQ

The documents and dates that lead to clearer, more comparable millwork pricing.

AP82 / CALGARY / 51.0447° N

Include current architectural drawings, interior elevations, details, specifications, finish schedules and addenda. State the bid deadline, construction schedule, site location and expected installation window.

Call out alternates, allowances and exclusions. Identify whether shop drawings, engineering, delivery, hoisting, protection and installation are part of the requested scope.

Planning a project? Send the current documents through our RFQ form so the scope can be reviewed in context.